Notice: the previous website may be found at https://archive.esteemsoft.com.my. Some of the information are still being migrated from archive.esteemsoft.com.my.
ESTEEM INNOVATION (ASIA) SDN BHD
Company No.: 201201001279 (974803-A)
SST ID: B16-1809-32001131
ITEM |
Screenshot/Picture |
1. Advance Import combining tracing and import in one-screen. |
|
2. Import or trace AutoCAD 2020-2024 dwg into Esteem. |
|
3. Esteem RC physical model BIM interoperability with Autodesk Revit 2021-2024 |
|
4. IFC2x3 Export |
|
5. Merging Plans Merge the regions, grids, beams, columns, rc walls, brickwalls, any loadings from another plan |
|
6. Multiple Sub-slabs merging. |
|
7. Auto fix Beam End Release on RC Wall. |
|
8. Steel member design check from Class 1 to Class 4 complying to EC3. |
|
9. Wall link detailing is added in schedule table and needed for every vertical rebar if it is >= 2%. |
|
10. Pile offset from edge of core wall to increase the capacity of the foundation. |
|
11. Reduced sub-frame moment giving more economical column and wall design. |
|
12. More economical Slab Design based on band-width contour. |
|
13. Slab displacement contour based on non-reduced 2D sub-frame stiffness. |
|
14. Forward Compatible. Allow project files created in Esteem 11 and future releases to be used in previous Esteem versions (only applicable for Esteem 11 and future releases). E.g. project files created in Esteem 11.0.41.0 can be used in Esteem 11.0.18.0. |
|
15. Flat Slab design and detailing. |
|
16. Simplified MRSA biaxial load combination feature which reduce seismic design to only 8 biaxial envelope combinations. |
|
17. FRP Reinforced Concrete Slab |
|
18. Just-in time Analysis Useful for quickly detecting free nodes in the 3D meshing as well as identifying any issues such as unstability in the 3D analysis There are 3 options: Generate 3D Frame Analyse 3D Frame 3D Frame Post Processing |
|
19. Narrow Slab Uplift Design |
|
20. Project Parameter New Features a. Wall Panel Clear Height b. Free nodes Check Optimised (Faster Beam Free Nodes Checking.) c. Column/Wall End Restraints (and Wall Design based on FE end restraints.) d. Multi-Section Beam Deflection (checking using weighed effective depth.) e. Beam Tension by Section f. Beam to Wall End Span (Beam end/inner span deflection check is based on its fixity to RC Wall end) g. Virtual Cantilever Wall h. Wall Detailing Schedule (with Wall & Column Marks on Floor Plans.) i. Wall Framing Beam Stiffness (Wall framing beam design is made obsolete or unnecessary) j. Slab Region Base k. Strut and Tie Fan Angle l. Slab Contour Cut Design m. Show Only Support Grids (show only support/necessary grids giving ‘cleaner’ grids and dimensions in detailing plan view) n. Flat Slab Method o. Indirect Support Ratio p. Show Footing Group Marks |
Figure h. (Wall Detailing Schedule) |
Pile Raft Foundation
Raft Foundation
Transfer Slab